Compiled by Sherri Giles; edited by P.J.C.
Manager Sherri Giles’ updated the Board of Directors on topics including the electrical upgrade project, building painting & insulation, garage restoration & painting, and serpentine walls.
Manager Sherri Giles’ updated the Board of Directors on topics including the electrical upgrade project, building painting & insulation, garage restoration & painting, and serpentine walls.
ELECTRICAL UPGRADE PROJECT
A presentation on the upcoming electrical upgrades in Building 1 (a Type 1) and Building 88 (a Type 8), has been moved to the March 26 Board meeting. Representatives of Triple C, Hariton Engineering, and Architectural Resources Group will attend and present.
BUILDING PAINTING & INSULATION
Work on all 2023 buildings has been completed, including patio gates and the Clubhouse. However, leaks were discovered at the Clubhouse, necessitating some roof repair.
GARAGE RESTORATION & PAINTING
Courts 3, 7, and 11 are slated for garage restoration, a complex project that requires coordinating the work of multiple vendors, including foundation, concrete and roofing repairs, termite control, and city inspections.
SERPENTINE WALLS
Contractor Craig Troxler reported that LA Department of Building and Safety has declined to accept the original plans and is requiring updated calculations from a structural engineer. Troxler will be reaching out to an engineer to discuss the necessary steps and specifications and will procure a proposal.
A presentation on the upcoming electrical upgrades in Building 1 (a Type 1) and Building 88 (a Type 8), has been moved to the March 26 Board meeting. Representatives of Triple C, Hariton Engineering, and Architectural Resources Group will attend and present.
BUILDING PAINTING & INSULATION
Work on all 2023 buildings has been completed, including patio gates and the Clubhouse. However, leaks were discovered at the Clubhouse, necessitating some roof repair.
GARAGE RESTORATION & PAINTING
Courts 3, 7, and 11 are slated for garage restoration, a complex project that requires coordinating the work of multiple vendors, including foundation, concrete and roofing repairs, termite control, and city inspections.
SERPENTINE WALLS
Contractor Craig Troxler reported that LA Department of Building and Safety has declined to accept the original plans and is requiring updated calculations from a structural engineer. Troxler will be reaching out to an engineer to discuss the necessary steps and specifications and will procure a proposal.